This LTE might be the most informative LTE written on the Enbridge Line 3 Pipeline I’ve seen.

It’s the first place I’ve read that “Some opponents of the project are concerned that pipelines pose a risk to the waters of Minnesota due to a leak. Any method of transporting crude oil (pipeline, rail, or truck) has a risk of a leak or spill. To transport the equivalent amount of crude oil on Line 3 will require either 10,000 rail cars/day or 24,000 tanker trucks/day.”

The Gov. Dayton/Commissioner Rothman Commerce Department testified that the existing pipeline should be shut down in addition to not building the new pipeline. Obviously, the pipeline will get built. The only question is whether it’ll get built in Minnesota or through another state. Metaphorically speaking, that ship’s already sailed. The question facing environmental activists is whether they want oil trains endangering cities multiple times a day or whether they want semis clogging highways.

What other LTE or Our View editorial has laid things out this succinctly? I’ll tell you how many. Since getting back into blogging last May, I’ve searched virtually daily for articles on this subject. The answer is exactly 0. Here’s another interesting, important, piece of information in making this decision:

The project will be constructed with modern high-grade steel pipe and use construction techniques that minimize the impact to the environment. In environmentally sensitive areas, Enbridge utilizes Horizontal Directional Drilling, which places the pipe deep below the environmentally sensitive area and utilizes double thickness pipe-wall.

TRANSLATION: It’s the safest way of getting oil from Alberta to Superior, WI. Enbridge wouldn’t have gotten a permit for the first pipeline if it hadn’t met Minnesota’s strict environmental standards.

Think of it this way. If Enbridge hadn’t done things right the past 20+ years, the Public Utilities Commission would’ve shit-canned this project in a heartbeat. This graphic shows how many hoops Enbridge, or any pipeline project, would have to jump through for permitting approval:

Think of each of those dots as another delay that environmental activists exploit. The simplest question to ask is whether Minnesota wants a petroleum-free state that relies heavily on transit? I’m betting that transit is totally impractical for most of Minnesota, especially in rural Minnesota. BTW, did you know that “Enbridge provides over 80 percent of the crude oil to the two refineries in Minnesota and one in Superior Wisconsin”? Did you know that “these refineries provide fuel for the agricultural, forest products, shipping, and mining industries, not to mention the majority of the fuel used for transportation in the state of Minnesota”?

Frankly, the testimony given by the Commerce Department to the Public Utilities Commission is dishonest. Whoever prepared the Commerce Department’s testimony should be prosecuted for perjury. Saying that the Line 3 Pipeline isn’t needed is like saying that highways aren’t needed to get people and products from one part of Minnesota to another part of Minnesota.